• HOMEPAGE
  • UNIVERSITY
  • ACADEMICS
  • OPEN EDUCATION
  • STUDENT AFFAIRS
  • RESEARCH
  • CAMPUS LIFE
  • LIBRARY
  • WEBMAIL
  • DIRECTORY
  • EVENTS
  • ANNOUNCEMENTS
  • ACADEMIC CALENDAR
  • PROSPECTIVE STUDENTS
  • FACULTY & STAFF
  • ALUMNI
  • SATIN ALMA
  • KVKK
  • INTERNATIONAL
  • PROSPECTIVE STUDENTS
  • FACULTY & STAFF
  • ALUMNI
  • QUALITY
  • KVKK
Menü
  • TR
  • EN
Anadolu University
  • UNIVERSITY
    Anadolu University
    Rektörlük Önü
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • About Anadolu
    • Administration
    • Internal Audit Unit
    • Office of Secretary General
    • Administrative Units
    • Boards - Commissions
    • Corporate Communications
    • Right to Information
    • Satın Alma
    Eskişehir Academy of Economic and Commercial Sciences, founded in 1958, formed the basis of Anadolu University. The Academy was replaced by Anadolu University in 1982, which has gained a well-deserved place as a modern, dynamic and innovative institution among the largest universities not only in Türkiye, but also in the world.
  • ACADEMICS
  • OPEN EDUCATION
    Anadolu Üniversitesi
    Açıköğretim Sistemi
    Quick Links
    • Anadolum eKampüs
    • Second University
    • OESSupport
    • Global Campus
    • Apply Now
    • Student Login
    • Open Education System
    • Programs In Türkiye
    • Programs Abroad
    • Admission
    • Akademik Takvim
    • Contact Info
    • Local Bureaus for Open Education Sevices in Türkiye
    Anadolu University Open Education System plays an essential role in overcoming educational problems of Türkiye not only by providing open and distance education to 1 million active students and 3.5 million graduates but also by developing specific projects. Besides with those numbers, the system is among the mega universities of the world. By the constantly renewing method of open and distance education, it implements many initiatives and innovations in the Turkish Higher Education System.
  • STUDENT AFFAIRS
  • RESEARCH
    Araştırma
    Araştırma
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • Units
    • Centers
    • TÜBİTAK Projects
    • Journals
    • Board of Ethics
    • Scientific Research Projects
    • ARINKOM
    Kısa adıyla BAP (Bilimsel Araştırma Projeleri), yüksek öğretim kurumlarındaki bilimsel araştırmaların desteklenmesi amacıyla geliştirilmiş bir uygulamadır. Bu uygulama YÖK'ün 01.01.2002 tarihinden geçerli olmak üzere yürülüğe aldığı Yükseköğretim Kurumları Bilimsel Araştırma Projeleri Hakkında Yönetmelik uyarınca gerçekleştirilmektedir. Üniversitemizin tüm öğretim elemanları BAP Komisyonuna başvurarak bilimsel araştırmaları için kaynak alabilirler.
  • CAMPUS LIFE
    Anadolu Üniversitesi
    Kampüste Yaşam
    Quick Links
    • Library
    • Webmail
    • Dining
    • Restaurants
    • Directory
    • Events
    • Announcements
    • Academic Calendar
    • Social Facilities
    • Culture and Arts Centers
    • Museums
    • Sports Facilities
    • Ensembles
    • Student Clubs
    • Campus Information
    • Photo Gallery
    At Anadolu University, social and cultural activities are as important as education and scientific research. The University frequently holds scientific events such as conferences, seminars, panels, congresses and symposia, and cultural activities such as exhibitions, stage performances and concerts. In addition to smaller conference halls in each unit, Atatürk Culture and Arts Center, Congress Center and Cinema Anadolu on Yunusemre Campus house many activities throughout the year.

PROJECT MANAGEMENT IN INSTRUCTIONAL TECHNOLOGIES

  • Home Page
  • Academics
  • Faculties
  • Graduate School
  • Depart. of Computer Education and Instructional Te
  • Master of Arts (MA) Degree
  • Program in Computer Education and Instructional Te
  • Course Structure Diagram with Credits
  • Project Management in Instructional Technologies
  • Description
Back

Description

Course Title Course Code Semester Required/Elective Theory + Practice ECTS
Project Management in Instructional Technologies BTÖ523 I. SEMESTER Elective Courses 3+0 7.5
Language of Instruction Türkçe
Course Type Elective Courses
Course Instructor(s) DR. ÖĞR. ÜYESİ SEMA ÜNLÜER
Mode of Delivery The mode of delivery of this course is Face to face
Prerequisites There is no prerequisite or co-requisite for this course.
Courses Recommended There is no recommended optional programme component  for this course.
Reading List
Assessment Methods 1st ExamFinal Exam
Work Placement N/A
  • Description
  • Content
  • Learning Outcomes
  • Learning Activities and Teaching Methods
  • Course's Contribution to Prog.
  • Assessment Methods
Web sitemizdeki çerezleri (cookie) kullanıcı deneyimini artıran teknik özellikleri desteklemek için kullanıyoruz. Detaylı bilgi için tıklayınız.
Google Analytics tarafından yönetilen çerezleri devre dışı bırakabilir veya kabul edebilirsiniz.
Anadolu Üniversitesi
  • ABOUT ANADOLU
  • About Anadolu
  • Office of Secretary General
  • Boards
  • Information and Documents
  • İletişim Bilgileri
  • ACADEMICS
  • Open Education System
  • Faculties
  • Graduate Schools and Institutes
  • Vocational Schools
  • Schools
  • OPEN EDUCATION
  • Open Education System
  • Programs in Türkiye
  • Programs Abroad
  • Admission
  • Academic Calendar
  • Learning Environments
  • About Examinations
  • Student Guides
  • STUDENT AFFAIRS
  • Academic Calendar
  • RESEARCH
  • Units
  • Research Centres
  • Science and Life
  • CAMPUS LIFE
  • Social Facilities
  • Culture and Arts Centers
  • Museums
  • Sports Facilities
  • Ensembles
  • Student Clubs
  • Campus Services
  • Photo Gallery
Android Application iOS Application
© 2025 Anadolu University - All rights reserved.